This professional on-site servicing package is designed for Woodward 505 turbine control units installed on STG 1 and STG 2 units in Waste Heat Recovery (WHR) systems, performed strictly in accordance with the attached Statement of Work (SOW). The service covers full diagnostic testing, functional calibration, component inspection, and performance optimization to ensure reliable operation of your turbine control system and maximize power generation efficiency.
| Parameter | Detail |
|---|---|
| Applicable Controller | Woodward 505 Turbine Control |
| Applicable Units | STG 1, STG 2 Turbines (WHR System) |
| Service Type | On-site Servicing & Calibration |
| Execution Standard | Per Attached SOW & Woodward OEM Specifications |
| Service Scope | Diagnostics, Calibration, Inspection, Performance Testing |
| Industry Application | Waste Heat Recovery Power Generation |
This on-site servicing is ideal for waste heat recovery power plants, industrial cogeneration facilities, and steam turbine power stations equipped with Woodward 505 control systems. It ensures precise turbine speed and load control, compliance with operational safety standards, and optimized energy recovery efficiency for STG turbine trains.